Mike’s Sierra drift project
In, out, in, out, try not to shake it all about. The engine’s been hanging off the end of the crane again, but finally it looks like it’s staying put. What’s been done this month:
New IKE water rail, engine mounted (again), moved the throttle body, made all the hard boost pipes, shortened the front dampers, fitted new Vibra-Technics mounts
Next on the to-do list:
Wire up the ECU, put fuel in, try and start it
Thanks:
IK Engineering, 01403 753373, www. ikengineering.co.uk Vibra-Technics, 01536 202789, www.vibra-technics.co.uk GAZ Shocks, 01268 724585, www.gazshocks.com
I’ll be honest, the Sierra hasn’t had much of a look in this year with the Fiesta taking all the lime light at the shows.This has been OK for me as…